Berkeley Lab

October 2017 – East River floodplain and Redwell Basin Drilling

East River floodplain:

N.B. I failed to note in my narration of the floodplain visit the relationship of the presented work with the recently installed water quality monitoring station deployed by Joel Rowland (LANL); Joel’s multi-parameter probe, as described on the last Watershed Function Science Community Call, is located immediately downstream of this video location.

Redwell Basin drilling:

Bonus photo: Headwaters of Oh-Be-Joyful Creek, taken in late September 2017. The creek has a confluence with Redwell Creek emanating from the eponymous basin some miles downstream of this photo.